Wolford (Austria)

From Efficiency Finder
Jump to: navigation, search

Back to EFFICIENCY FINDER

Back to Information about cotton and bast fibres

Back to the Case studies


1. Case study or Built example Case study


2. Industry Sector Textile - Dyeng


3. Industrial application To prepare hot water for the dyeing process


4. Process description
  • Flowsheet


Flowsheet-Wolford (Austria).jpg


  • Processes

No information available.


5. Energy flows and temperature ranges
  • Main heat supply system and fuel

Natural gas.

  • Energy consumption (Sankey)


Energy consumption-Wolford (Austria).jpg


  • Temperature ranges


Temperature ranges-Wolford (Austria).jpg


6. Solar Thermal Plant
  • Used scheme:


Solar Thermal Plant-Wolford (Austria).jpg


  • Description of the main features and components:

No information is available.

  • Pictures of the built solar system:

No information available.


7. Energy savings
  • Pinch analysis results:

No information available.

  • Energy savings:

Saved amount of natural gas per year (h = 65%):


Saved amount of natural gas per year.jpg


8. Economic evaluation
  • Economic parameters of the built solar system:


Economic parameters of the built solar system.jpg

Payback time: 10 years.


Back to EFFICIENCY FINDER

Back to Information about cotton and bast fibres

Back to the Case studies