Wolford (Austria): Difference between revisions
From Efficiency Finder
Jump to navigationJump to search
m (Protected "Wolford (Austria)" [edit=autoconfirmed:move=autoconfirmed]) |
No edit summary |
||
Line 1: | Line 1: | ||
Back to [[EFFICIENCY FINDER]] | |||
Back to [[Subsection DB textiles|EFFICIENCY FINDER OF TEXTILE INDUSTRY]] | Back to [[Subsection DB textiles|EFFICIENCY FINDER OF TEXTILE INDUSTRY]] | ||
Back to [[Information about cotton and bast fibres]] | Back to [[Information about cotton and bast fibres]] | ||
Line 85: | Line 86: | ||
Payback time: 10 years. | Payback time: 10 years. | ||
Back to [[EFFICIENCY FINDER]] | |||
Back to [[Subsection DB textiles|EFFICIENCY FINDER OF TEXTILE INDUSTRY]] | Back to [[Subsection DB textiles|EFFICIENCY FINDER OF TEXTILE INDUSTRY]] | ||
Back to [[Information about cotton and bast fibres]] | Back to [[Information about cotton and bast fibres]] |
Revision as of 08:42, 20 October 2010
Back to EFFICIENCY FINDER
Back to EFFICIENCY FINDER OF TEXTILE INDUSTRY
Back to Information about cotton and bast fibres
- 1. Case study or Built example Case study
- 2. Industry Sector Textile - Dyeng
- 3. Industrial application To prepare hot water for the dyeing process
- 4. Process description
- Flowsheet
- Processes
No information available.
- 5. Energy flows and temperature ranges
- Main heat supply system and fuel
Natural gas.
- Energy consumption (Sankey)
- Temperature ranges
- 6. Solar Thermal Plant
- Used scheme:
- Description of the main features and components:
No information is available.
- Pictures of the built solar system:
No information available.
- 7. Energy savings
- Pinch analysis results:
No information available.
- Energy savings:
Saved amount of natural gas per year (h = 65%):
- 8. Economic evaluation
- Economic parameters of the built solar system:
Payback time: 10 years.
Back to EFFICIENCY FINDER