Difference between revisions of "Wolford (Austria)"
From Efficiency Finder
m (Changed protection level for "Wolford (Austria)" ([edit=sysop] (indefinite) [move=sysop] (indefinite))) |
|
(No difference)
|
Latest revision as of 11:16, 1 March 2013
Back to EFFICIENCY FINDER
Back to Information about cotton and bast fibres
Back to the Case studies
- 1. Case study or Built example Case study
- 2. Industry Sector Textile - Dyeng
- 3. Industrial application To prepare hot water for the dyeing process
- 4. Process description
- Flowsheet
- Processes
No information available.
- 5. Energy flows and temperature ranges
- Main heat supply system and fuel
Natural gas.
- Energy consumption (Sankey)
- Temperature ranges
- 6. Solar Thermal Plant
- Used scheme:
- Description of the main features and components:
No information is available.
- Pictures of the built solar system:
No information available.
- 7. Energy savings
- Pinch analysis results:
No information available.
- Energy savings:
Saved amount of natural gas per year (h = 65%):
- 8. Economic evaluation
- Economic parameters of the built solar system:
Payback time: 10 years.
Back to EFFICIENCY FINDER
Back to Information about cotton and bast fibres
Back to the Case studies